Tunneling Coal Mine Roadheader Tunneling Roadheader Cantilever Roadheader

Tunneling Coal Mine Roadheader tunneling roadheader Cantilever Roadheader 

EBZ coal mine roadheader is primarily employed in coal roadway, semi-coal roadway and comfortable rock roadway and tunnel tunneling. Higher configuration, secure and reliable. Via the next transport airplane, it can be matched with dump truck, shuttle truck, belt conveyor, and so on. to recognize continuous slicing, loading and transportation.
Functioning mode: largely is composed of going for walks system, functioning system, loading system and transfer system. As the going for walks system developments, the cutting head in the functioning mechanism breaks rocks and carries them away. It has the advantages of security, higher performance and very good high quality.

Digital Control Program
EBZ135 highway header adopts explosive-evidence and intrinsically risk-free swap box and intrinsically protected operation box which are little in volume, light-weight in excess weight, versatile in procedure, secure and reliable major controllers are mounted in a sealed shell to defend electromagnetic interference effectively operating circumstances are displayed on Liquid crystal display display screen, it adopts menu kind operation interface and it is adaptable and protected to established parameters it possesses, overvoltage, motor overload, period reduction, short circuit, in excess of-temperature and earth leakage lockout features and so forth.

CZPT Method
EBZ135 sort road header adopts constant electrical power, force lower off and load sensitivity handle. Major hydraulic parts undertake items of planet famous brands.

Cutting CZPT
Reducing head is optimized with emulation approach reducing tooth adopts items from Kennametal CZPT its layout is sensible and rock breaking capacity is robust. 

Spraying Program
Spraying method of EBZ135 sort highway header is made up of internal spraying technique and exterior spraying method. Internal spraying system is to spray guiding teeth so strengthen exterior spraying method layout of external spraying program is affordable interior spraying possesses h2o leakage detecting purpose.

Very first CZPT
First conveyor adopts straight construction and is related with insertion board efficiently. The conveying operation is unobstructed.

Traveling Mechanism 
Travelling driving method very integrates motor and reduction equipment with internationally advance systems its output torque is huge and it is suitable for operation with large dip angle.
If there is restrict on bodyweight or total top for the duration of transportation, the street header can be disassembled to transportation.

 

CZPT Specs  
Primary CZPT Specification EBZ135
Electrical power of cutting motor 135Kw
Energy of gasoline pump motor 75Kw
Cutting assortment Peak: 4 m
Width: five.one m
Equipment fat 38.8 T
Dimension (LxWxH) 8.92×2.8×1.fifty three m
Rotary velocity of cutter head 44 r/min
Rotary speed of star wheel 33 r/min
Loading capability three.4 m³/min
Velocity of 1st conveyor 40 m/min
Speed of driving device ~six.5m/min
Gradeability ±18º
Gantry top 420 mm
Gasoline tank quantity 500 L
Dinting depth .2m
Offer voltage AC1140/660V

Merchandise Advantages:

1> The reducing part has the perform of inner and exterior spray, leakage detection and defense, the slicing motor has thermal defense, the reducing head is cone-shaped, and the tooth base is spiral. The interior spray seal adopts the world’s foremost automatic compensation technology with impartial house legal rights, which completely solves the issue of unreliability of inside spray in the tunneling device. Patent no. : ZL2006 20138210.8.

two > The width of the plate is two.5m and two.8m, which are CZPT for end users to decide on. The working surface of the plate adopts double-sided Angle, which is convenient for loading and cleansing. and the overall design and style helps make the equipment more productive. The charging device is pushed directly by a lower-velocity big torque motor with a curved 3-tooth star wheel.

3> The transport plane adopts medium double chain, bilateral chain and sleeve straightforward roller chain transportation composition, which is ideal for the transportation of coal, semi-coal rock and rock components. The foundation plate is linear and the transportation is clean, and the scraper transportation is immediately driven by two low-pace and high-torque hydraulic motors.

4> walking part adopts the hugely built-in composition of reducer and hydraulic motor, with modest quantity and large reliability. The climbing unit adopts the blended structure of increasing oil cylinder and altering plate.

5> CZPTal technique is controlled by programmable controller and has the features of new thorough security method module to realize defense, dynamic display of wave crystal Chinese people, thermal protection of reducing motor, computerized method fault detection and memory.

6 > hydraulic program pump and operating valve adopt the world’s most innovative unit which impoort kind German, with consistent electrical power control, pressure reducing, load delicate functions.

seven > The rear assistance system realizes the prolonged span assistance and improves the equipment balance.

OUR Edge:

We have our possess following-sale provider engineers who had much more than 40 many years knowledge.

We can source the most competitive value and the most specialist service.

We have skilled overseas trade staffs who can support fix troubles in time.

Why choose us
1. We could provide seven*24H support at the first time for complex assistance and first components provide.
2 .Attention to website ahead of sale, good quality in sale and education after sale.
3. Our organization has superior machining products, scientific technological process and sophisticated screening gear.

FAQ
1:What kind conditions of payment can be acknowledged?
  For conditions of payment,L/C,T/T,D/P(can be)could approved.

two: What certificates are CZPT in CZPT?
  For the certification, we have CE, ISO,SGA.

3: What about the supply time?
  seven-30 days following receiving the deposit.

4: What about the guarantee time?
  twelve months after shipment or 2000 functioning hrs, whichever occuts very first.

5. What about the Minimum Get Amount?
  The MOQ is 1 pcs.    
 

Tunneling Coal Mine Roadheader Tunneling Roadheader Cantilever Roadheader