Sc200 200 Construction Machinery Construction Hoist Elevator Provide OEM Service Construction Building Hoist

CZPT CZPT CZPT CZPT CZPT Offer OEM Support CZPT Creating CZPT

 

Ability: 1000kg Cage: CZPT Cage
Speed: -34 M/min Cage Dimention: 3.*one.3*2.twenty five
Max Installation Height: 100m Energy: 380v 50Hz

    Details Specification

    Merchandise CZPT hoist
    Product SC100/one hundred
    Rated potential/for each cage 1000kg
    Lifting speed -34m/min
    Cage size 3.two*1.five*two.25m
    Motor power 2*7.5kw
    Speed ratio one:18
    Invertor Power fifteen kw
    Security system SAJ30-one.2
    Mast part size .45*.45*one.508m or .sixty five*.sixty five*1.508m
    Max. Installation height 100m
    Cable variety Cable basket/cable trolley

    Other versions we have:

    Attribute Product Rated Loading Lifting Speed Motor Energy Inverter Electrical power
    CZPT cage SC100/a hundred 2×1000kg -34m/min 2×7.5Kw 15kw
    SC150/one hundred fifty 2×1500 -34m/min 2×9Kw 22Kw
    SC200/two hundred 2×2000kg -45m/min 3×12Kw 37 Kw
    SC200/two hundred 2×2000kg -34m/min 2×12Kw 37 Kw
    SC200/two hundred 2×2000kg -63m/min 3×15 Kw forty five Kw
    SC200/two hundred 2×2000kg -96m/min 3×18.five Kw 75 Kw
    One cage SC100 1000kg -34m/min 2×7.5Kw 15kw
    SC150 1500Kg -34m/min 2×9Kw 22Kw
    SC200 2000kg -45m/min 3×12Kw 37 Kw
    SC200 2000kg -34m/min 2×12Kw 37 Kw
    SC200 2000kg -63m/min 3×15 Kw 45 Kw
    SC200 2000kg -96m/min 3×18.five Kw 75 Kw

    1000kg -34/min double cages ernergy saving CZPT elevator

    • CZPT elevator is a vertical transporting lifting tool for constructing building, these kinds of as bradge. It is safe and effective to carry components and passenger to different flooring. Loading Capability range is 1000kg-2700kg.
    • 1508*60*forty Rack and M8 pinion was applied to aid the development hoist climb the mast stably and efficiently and sefely.
    •  Mufti-gear for basic safety: Protection gadget, up & down limit switch, CZPT limit switch, overload protector.
    • Wi-fi contacting program for person.
    • Separate operator cupboard with cozy room for operator. Also can make pick CZPT operater cupboard.
    • Delicate start off and end, with the support of progress VFD control. The pace can be set at -34m/min as necessary CZPT limitation.

    Packing & Delivery

    CZPTer visit

    Company profile

    Qualification & Certificates

     

     

    Sc200 200 Construction Machinery Construction Hoist Elevator Provide OEM Service Construction Building Hoist